Submission Date | Project Number | Project Name | Contractor | Base Bid | Alternates | Notice of Intent Issued |
---|---|---|---|---|---|---|
12/17/2021 | 19603 | Remodel Business Office & Replace Windows, Division of Veterans Services, Lewiston, Idaho | K & G Construction | $134,000 | 1. $18,000 | 1/6/2022 |
12/9/2021 | 21353 | Replace Chiller, Data Room, 8th Floor, PTC, Department of Health and Welfare, Boise, Idaho | YMC, Inc. | $214,806 | ||
Paige Mechanical | $227,604 | |||||
American Chiller Service | $179,987 | 12/15/2021 | ||||
Intelligent Design Mechanical Solutions | $235,000 | |||||
ACCO Engineered Systems | $197,718 | |||||
Cascade Enterprises NON-RESPONSIVE | ||||||
TVR, Inc. | $245,425 | |||||
RM Mechanical | $226,292 | |||||
12/7/2021 | 21228 | Partial Reroof - Reed Gym, Idaho State University, Pocatello, Idaho | Robison Roofing | $395,000 | 1. $85,000 | 1/24/2022 |
Smith Roofing | $415,280 | 1. $93,400 | ||||
12/7/2021 | 21223 | Reroof Oboler Library, Idaho State University, Pocatello, Idaho | Robison Roofing | $576,000 | Unit Price 1: $500.00 | |
Smith Roofing | $548,322 | Unit Price 1: $400.00 | 12/29/2021 | |||
QTR, Inc. | $653,325 | Unit Price 1: $225.00 | ||||
12/1/2021 | 19350 | Renovations of Various Admin Spaces & Roof Safety Rail, State Health Lab, Department of Health and Welfare, Boise, Idaho | NNAC | $369,476 | 1. $107,381 2. $20,045 | |
Triple G Construction | $256,136 | 1. $125,708 2. $28,647 | ||||
Excelsior Construction | $234,800 | 1. $83,600 2. $18,500 | 12/2/2021 | |||
Pacific Source Construction | $320,000 | 1. $84,000 2. $32,000 | ||||
EKC, Inc. | $256,813 | 1. $82,115 2. $16,106 | ||||
Datum Construction | $360,914 | 1. $98,864 2. $16,421 | ||||
11/18/2021 | 21070 | Elevator Upgrade, McKelway Hall, ICIO, Idaho Department of Correction, Orofino, Idaho | K&G | $345,242 | 1. $6,958 | 11/22/2021 |
Kenaston | $347,200 | 1. $15,800 | ||||
11/16/2021 | 21095 | Interior Renovations, Elevator Modernization, ADA, Shields, College of Southern Idaho, Twin Falls, Idaho | Petersen Brothers | $470,500 | ||
11/16/2021 | 21239 | Siding and Window Replacement, Pulling Courts, Idaho State University, Pocatello, Idaho | Starr Corp. | $597,000 | Unit Price 1: $21,840 Unit Price2: $5,693 | 11/16/2021 |
11/15/2021 | 21400 | Replace Bedroom Doors, PTF, State Hospital South, Department of Health and Welfare, Blackfoot, Idaho *ALL BIDS REJECTED* | Ormond Builders | |||
11/9/2021 | 21605 | Cemetery Project, Division of Veterans Services, Blackfoot, Idaho ***ALL BIDS REJECTED*** | Century Contactors | |||
Harper Const. Inc. | ||||||
Rivers West | ||||||
11/3/2021 | 20091 | Replace Irrigation Control System, College of Southern Idaho, Twin Falls, Idaho | Windsors Inc. | $363,000 | 11/19/2021 | |
Franz Witte | $428,500 | |||||
Clearwater Landscape & Irrigation NON-RESPONSIVE | ||||||
10/21/2021 | 21233 | Relocate Testing Center, Tingey Administration Building, Idaho State University, Idaho Falls, Idaho | Alan Clark Construction | $415,500 | 1. $46,800 2. $19,250 3. $27,300 | |
Bateman Hall | $387,000 | 1. $27,900 2. $10,975 3. $18,400 | 11/8/2021 | |||
10/7/2021 | 19263 | Acoustic Mitigation & Isolation, Phase 1, LHSOM and Ridenbaugh Hall, University of Idaho, Moscow, Idaho | Quality Contractors | $3,560,045 | 1. $78,289.46 2. $927,026 | 10/26/2021 |
NNAC | $3,699,553 | 1. $83,628 2. $588,629 | ||||
10/6/2021 | 21204 | Rec. Center Chiller Replacement, Boise State University, Boise, Idaho | American Chiller Service | $270,100 | 10/20/2021 | |
ACCO Eng. Systems | $283,817 | |||||
Cascade Enterprises | $354,000 | |||||
9/22/2021 | 21361 | City Water Connect, Living Units, SWITC, Department of Health and Welfare, Nampa, Idaho | Idaho Site Works | $287,614.21 | ||
McAlvain Civil Constructors | $333,300 | |||||
Paul Construction | $243,000 | 9/28/2021 | ||||
8/19/2021 | 21061 | New Wastewater Headworks, North Idaho Correctional Institution, Department of Correction, Cottonwood, Idaho | Syblon Reid | $675,500 | ||
S & L Underground | $697,480 | |||||
Challenger Companies | $645,000 | 8/31/2021 | ||||
8/17/2021 | 20451 | Mica Peak Communication Site, Public Safety Communications, Coeur d'Alene, Idaho ***ALL BIDS REJECTED*** | Day Wireless | |||
IMCO | ||||||
Wesslen | ||||||
TML Construction | ||||||
NNAC Construction | ||||||
Shawn Cole Construction | ||||||
8/12/2021 | 20407 | Replace Water Mains on Campus, State Hospital South, Department of Health and Welfare, Blackfoot, Idaho | Taylor Construction Inc. | $91,254 | ||
Mickelson Construction | $148,472.75 | |||||
Vanguard LLC | $105,955 | |||||
The Yard Butler, LLC. | $95,000 | |||||
Ag Services Inc. | $66,423 | 8/31/2021 | ||||
Gale Lim Construction, LLC | $107,500 | |||||
8/10/2021 | 19382 | Concrete Repair, State Hospital North, Department of Health and Welfare, Orofino, Idaho | Skinner Steel | $294,839.60 | ||
K & G Construction | $205,000 | 8/16/2021 | ||||
8/5/2021 | 21172 | Replace Windows, Molstead Library, North Idaho College, Coeur d'Alene, Idaho | James Construction | $85,819 | 1. $38,969 | 8/18/2021 |
Bobo Construction, Inc. | $148,690 | 1. $43,100 | ||||
7/28/2021 | 17236 | Eames ATEIC Renovations, Phase 3, Idaho State University, Pocatello, Idaho | Valley Design & Construction | $5,235,920 | 1. $347,115 2. $39,470 3. $32,805 | |
Century Contractors | $4,497,754 | 1. $312,107 2. $32,055 3. ($7,253) | ||||
Star Corp. | $4,222,000 | 1. $365,000 2. $44,500 3. ($20,000) | 8/16/2021 | |||
Big D Construction | $4,612,860 | 1. $368,270 2. $40,450 3. ($20,200) | ||||
7/22/2021 | 21241 | McIntosh Parking Lot, Idaho State University, Pocatello, Idaho | Idaho Materials & Construction | $233,000 | Unit Price: $4,500 | 8/11/2021 |
Mickelson Construction | $269,711.68 | Unit Price $3,800 | ||||
Harper Construction | $310,000 | Unit Price $8,500 | ||||
7/1/2021 | 21171 | Restroom Remodel/Refresh, Hedlund, North Idaho College, Coeur d'Alene, Idaho | WM Welch Corp | $332,529 | 7/7/2021 | |
James Construction | $439,000 | |||||
6/24/2021 | 21330 | Parking Repair/Turn Pads, IF RC, Division of Military, Idaho Falls, Idaho | JM Concrete | $168,100 | 6/30/2021 | |
6/22/2021 | 20603 | Remodel Staff Lounge, Division of Veterans Services, Pocatello, Idaho | J & S Construction | $131,940 | ||
Ormond Builders | $122,313 | 7/12/2021 | ||||
Streamline | $9,600 | |||||
6/17/2021 | 21331 | Parking Repair, Rigby RC, Division of Military, Rigby, Idaho | JM Concrete | $101,940 | ||
RC Heavy Haul | $53,499 | 7/1/2021 | ||||
6/9/2021 | 18200 | Chiller Replacement, Liberal Arts Building, Boise State University, Boise, Idaho | Lacy Mechanical | $253,600 | 6/22/2021 | |
PMG | $293,706 | |||||
RM Mechanical | $431,598 | |||||
Cascade | $344,000 | |||||
6/8/2021 | 19605 | Expand Dining Room, Idaho State Veterans Home, Division of Veterans Services, Lewiston, Idaho | Wellens General Contractors | $526,000 | 6/21/2021 | |
K & G Construction | $609,259 | |||||
6/4/2021 | 20006 | Replace Domestic Water Service, LBJ Building, Department of Administration, Boise, Idaho | Cascade Enterprises Inc. | $1,230,000 | 6/10/2021 | |
King Mechanical LLC | $1,273,762 | |||||
Lacey Mechanical Inc. | $1,283,000 | |||||
NNAC Inc. | $1,402,000 | |||||
6/3/2021 | 21608 | Door Security System, Idaho State Veterans Home, Division of Veterans Services, Lewiston, Idaho | HEI Security | $198,000 | 6/22/2021 | |
6/3/2021 | 21531 | Replace Mechanical Equipment - Phase 1, Department of Juvenile Corrections, Nampa, Idaho | TVR | $202,300 | 1. $52,780 | 6/14/2021 |
RM Mechanical | $256,679 | 1. $38,567 | ||||
5/25/2021 | 21601 | Replace Doors/Hardware/Security, VET-P, Division of Veterans Services, Lewiston, Idaho | Ormond Builders | $91,172 | 1. $71,900 2. $11,100 3. $75,200 4. $226,900 | 6/22/2021 |
5/20/2021 | 19600 | Replace Flooring, Activity, Therapy, and Public Restrooms, Idaho State Veterans Home, Division of Veterans Services, Lewiston, Idaho | K&G Construction | $92,000 | 1. $34,500 2. $81,000 3. $150,000 | 6/2/2021 |
Quality Contractors NON-RESPONSIVE | ||||||
5/18/2021 | 21609 | Handrails and Wall Protection, Idaho State Veterans Home, Division of Veterans Services, Pocatello, Idaho | Ormond Builders | $96,160 | 1. $21,700 2. $10,500 3. $1,000 | 5/27/2021 |
5/13/2021 | 21256 | Exterior Masonry Repairs, Admin Building, University of Idaho, Moscow, Idaho | Hydro-Tech | $659,000 | 1. $16,500 2. $10,300 3. $96,400 4. $206,200 5. $173,800 6. $76,550 7. $3,450 | |
Pioneer Waterproofing | $670,000 | 1. $9,095 2. $17,500 3. $78,068 4. $45,800 5. $110,350 6. $60,400 7. $3,800 | 6/3/2021 | |||
Talisman | $803,146 | 1. $7,465 2. $15,242 3. $166,104 4. $134,963 5. $206,448 6. $141,723 7. $7,557 | ||||
Yoy Inc. | $644,115 | 1. $12,620 2. $9,780 3. $172,080 4. $75,212 5. $208,405 6. $86,609 7. $1,980 | ||||
5/5/2021 | 19623 | Historic Renovation, Stricker/Rock Creek, Idaho State Historical Society, Hansen ***NO BIDS RECEIVED*** | ||||
5/4/2021 | 21530 | Replace Backup Generator, JCCL, Department of Juvenile Corrections, Lewiston, Idaho | 4J Electric | $284,883.00 | ||
Mangum Construction | $167,400.00 | 5/18/2021 | ||||
Twin City Electricians | $169,000.00 | |||||
4/22/2021 | 19532 | Replace Flooring, Phase 2 and Shower Remodel, Department of Juvenile Corrections, Lewiston, Idaho | A & R Construction | $146,026.73 | 1. $10,209.18 2. $45,355.77 | 5/14/2021 |
4/20/2021 | 21252 | Replace Roof, Menard-Law Building, University of Idaho, Moscow, Idaho | Icon Corporation | $497,000 | 1. $352,000 | 5/7/2021 |
4/20/2021 | 19240 | Alumni and Visitor's Center, Idaho State University, Pocatello, Idaho | Bateman-Hall | $9,897,000 | 1. $99,500 2. $230,000 3. $100,000 | |
Big-D Construction | $10,016,969 | 1. $189,091 2. $219,938 3. $109,198 | ||||
CM Company | $10,950,000 | 1. $91,000 2. $224,000 3. $110,000 | ||||
Construction Solutions Company | $11,098,000 | 1. $63,000 2. $197,000 3. $97,000 | ||||
Morgan Construction | $11,554,061 | 1. $103,416 2. $258,019 3. $121,457 | ||||
Ormond Builders | $9,136,147 | 1. $137,123 2. $244,538 3. $117,590 | 6/2/2021 | |||
Century Contractors | $10,182,426 | 1. $121,882 2. $186,393 3. $100,763 | ||||
4/15/2021 | 21253 | Storm Drain/Pavement Repairs, Rayburn St., University of Idaho, Moscow, Idaho | Motley-Motley | $289,000 | 1. $121,000 | |
Germer Construction | $264,110 | 1. $122,956 | ||||
ML Albright & Sons | $180,000 | 1. $105,000 | 4/23/2021 | |||
4/15/2021 | 19227 | HVAC Upgrade, Reed Gym, Idaho State University, Pocatello, Idaho | Harper Construction | $1,840,000 | 1. $178,000 2. $172,000 3. $168,000 | |
J & S Construction | $1,669,980 | 1. $115,670 2. $181,900 3. $190,300 | ||||
Century | $2,249,243 | 1. $58,860 2. $263,652 3. $201,693 | ||||
CR Clark | $1,698,000 | 1. $63,200 2. $160,000 3. $165,000 | 5/18/2021 | |||
4/14/2021 | 21402 | Replace Asphalt, Chandler Circle, Area B, State Hospital South, Department of Health & Welfare, Blackfoot, Idaho | Mickelsen Construction, Inc. | $166,850.75 | 1. $15,000 | |
Gale Lim Construction LLC. | $129,140 | 1. $9,610 | 4/26/2021 | |||
R.C. Heavy Haul Inc. | $179,550 | 1. $13,799 | ||||
Idaho Materials and Construction | $169,304 | 1. $10,455 | ||||
Knife River Corporation | $183,572.30 | 1. $14,952.75 | ||||
4/8/2021 | 21857 | Elevator service, Maintenance, Alteration, and Repairs Contract, Capitol Mall, Boise Idaho | TK Elevator | $136,340.00 | 4/14/2021 | |
Schindler Elevator | $227,480.00 | |||||
4/8/2021 | 21858 | Elevator service, Maintenance, Alteration, and Repairs Contract, Chinden Campus, Boise, Idaho | TK Elevator | $91,700.00 | 4/14/2021 | |
Schindler Elevator | $117,288.00 | |||||
Premier Elevator | $168,155.24 | |||||
4/8/2021 | 21859 | Elevator service, Maintenance, Alteration, and Repairs Contract, Idaho Falls, Idaho | TK Elevator | $15,600.00 | 4/14/2021 | |
Schindler Elevator | $21,020.00 | |||||
4/8/2021 | 21860 | Elevator service, Maintenance, Alteration, and Repairs Contract, Lewiston, Idaho | TK Elevator | $19,120.00 | 4/14/2021 | |
Schindler Elevator | $23,791.00 | |||||
4/8/2021 | 18233 | Replace Exterior Stairs, Schubert Hts. (Bldg 56) Idaho State University Pocatello, Idaho | Ormond | $614,152 | 1. $50,600 2. $17,000 | |
Century | $583,824 | 1. $33,925 2. $18,684 | 5/6/2021 | |||
4/8/2021 | 20300 | HVAC/Refurbish Air Handlers, Department of Labor, Boise, Idaho | Hobson Fabricating | $205,600 | 1. $28,400 2. $13,900 | |
RM Mechanical | $217,491 | 1. $18,189 2. $24,515 | ||||
YMC Inc. | $146,340 | 1. $23,530 2. $16,071 | ||||
ACCO | $124,833 | 1. $21,387 2. $8,436 | 4/21/2021 | |||
TVR | $218,300 | 1. $32,800 2. $24,000 | ||||
4/1/2021 | 20530 | Roadways, Phase 3, Department of Juvenile Corrections, St. Anthony, Idaho | D.L. Beck | $684,657 | 1. $305,490 2. $165,000 | 4/6/2021 |
3/31/2021 | 17240 | College of Technology Nursing Program Remodel, Idaho State University, Pocatello, Idaho | CR Clark Construction | $1,583,000 | 1. $20,777 2. $9,427 | 5/13/2021 |
Century Contractors | $1,739,837 | 1. $18,224 2. $12,398 | ||||
3/25/2021 | 20256 | Life Safety, Buchanan Engineering Lab, Phase 3, University of Idaho, Moscow, Idaho | Quality Contractors | $437,226 | 1. $82,740 2. $25,794 | |
K & G Construction | $346,355 | 1. $97,021 2. $38,610 | 4/20/2021 | |||
3/23/2021 | 18460 | Canyon County Center Heat Pump Replacement, College of Western Idaho, Nampa, Idaho | TVR | $125,600 | 1. $22,800 2. $27,400 3. $29,600 | 4/20/2021 |
YMC | $221,757 | 1. $38,514 2. $46,354 3. $46,344 | ||||
Hobson | $157,700 | 1. $29,300 2. $35,400 3. $37,700 | ||||
ACCO | $157,731 | 1. $26,726 2. $32,918 3. $35,014 | ||||
RM Mechanical | $208,705 | 1. $36,857 2. $43,503 3. $50,969 | ||||
Cascade Enterprises | $200,000 | 1. $42,000 2. $49,000 3. $50,000 | ||||
3/23/2021 | 20091 | Replacement of Irrigation Control System, College of Southern Idaho, Twin Falls, Idaho ***NO BIDS RECEIVED*** | ||||
3/11/2021 | 21170 | Roof Replacement, Hedlund, North Idaho College, Coeur d'Alene, Idaho | Icon Corp. | $373,000 | 1. $583,000 2. $33,000 | 4/7/2021 |
C&C Construction NON-RESPONSIVE | ||||||
Granite NON-RESPONSIVE | ||||||
3/4/2021 | 20601 | Replace Int/Ext Light Fixtures, Idaho State Veterans Home, Idaho Division of Veterans Services, Lewiston, Idaho | Twin City Electricians NON-RESPONSIVE | |||
Mangum Construction NON-RESPONSIVE | ||||||
K & G Construction | $159,925 | 1. $53,594 2. $57,479 3. $42,467 4. $21,430 | 4/7/2021 | |||
3/4/2021 | 19234 | Roof System Replacement, Rendezvous, Idaho State University, Pocatello, Idaho | Robison | $630,000 | 1. $130,000 2. $85,000 3. $180,000 Unit Price: $2,500 | |
Briggs | $394,413 | 1. $73,151 2. $78,267 3. $52,059 Unit Price: $800 | 4/7/2021 | |||
Upson | $505,230 | 1. $111,500 2. $142,000 3. $165,000 Unit Price: $8,000 | ||||
Signature | $503,122 | 1. $113,000 2. $0 3. $84,356 Unit Price: $3,750 | ||||
Weathertight | $444,700 | 1. $81,060 2. $78,800 3. $79,625 Unit Price: $1,175 | ||||
2/24/2021 | 19339 | Roof Repair - Burley RC, Division of Military, Burley | Upson Company | $812,655 | 1. $21,800 | |
Modern Roofing NON-RESPONSIVE | ||||||
Smith Roofing NON-RESPONSIVE | ||||||
Robison Roofing | $440,000 | 1. $5,000 | 3/15/2021 | |||
2/18/2021 | 21154 | Fire Sprinkler System, MTB, Lewis-Clark State College, Lewiston, Idaho | Kenaston Corporation | $420,500 | 1. $66,000 2. $263,500 3. $99,000 4. $149,00 5. $57,000 | 4/7/2021 |
2/18/2021 | 19007 | Replace 5th Floor Surface Coating, State Parking Garage #1, Department of Administration, Boise, Idaho | Watson Associates | $459,316 | 1. $13,664 | 3/5/2021 |
2/11/2021 | 20607 | Modernize West Wing Elevators – VET-B, Division of Veterans Services, Boise, Idaho | Petersen Brothers | $529,443 | 1. $51,644 2. $37,070 | |
NNAC | $488,000 | 1. $51,000 2. $37,000 | ||||
EKC | $482,475 | 1. $48,710 2. $34,964 | 3/11/2021 | |||
2/2/2021 | 21855 | Asbestos Abatement Service Contract, North Region | PTI | $104,036 | 2/10/2021 | |
1/28/2021 | 21856 | Asbestos Abatement Service Contract, Southest Region | PTI | $48,300 | 2/10/2021 | |
1/28/2021 | 21858 & 21859 | Asbestos Abatement Service Contracts (2), Southwest Region | PTI | $47,195 | 2/10/2021 | |
LLS Services | $536,000 | |||||
AbatementPro | $48,300 | 2/10/2021 |