Submission Date | Project Number | Project Name | Contractor | Base Bid | Alternates | Notice of Intent Issued |
---|---|---|---|---|---|---|
12-19-24 | 21101 | Upgrade Windows/Doors, Shields Building, College of Southern Idaho, Twin Falls, Idaho | Starr Corporation | $109,000 | 1. $60,000 2. $61,000 | 01-06-25 |
Andersen Construction | $134,020 | 1. $51,500 2. $52.500 | ||||
Gary Jones Construction | $183,503 | 1. $57,217 2. $56,662 | ||||
Suburban Construction Management | $169,682 | 1. $60,928 2. $61,487 | ||||
12-05-24 | 24096 | Gymnasium Elevator Reconditioning, College of Southern Idaho, Twin Falls, Idaho | Gary D. Jones Construction Co., Inc. | $212,738 | $19,500 | 12-26-24 |
Pacific Source Construction | $236,000 | $16,000 | ||||
11-12-24 | 24351 | Lobby Security Access Controls, SSC, Department of Health & Welfare, Blackfoot, Idaho | Alan Clark Construction | $136,800 | 12-03-24 | |
11-12-24 | 24512 | Remodel Training Facility Bathroom, POST, Idaho State Police, Meridian, Idaho | Optimum Build Group, Inc. | $184,602 | $15,371 | |
Wright Brothers | $196,000 | $31,200 | ||||
Barrier Building | $195,000 | $23,100 | ||||
Andersen Construction | $167,420 | $20,000 | ||||
Excelsior Construction | $169,300 | $12,300 | ||||
Cascade Enterprises | $204,311 | $31,939 | ||||
Beal Corp. | $189,900 | $23,000 | ||||
Pacific Source Corp. | $154,000 | $19,400 | 11-20-24 | |||
10-17-24 | 24011 | Replace 3 Rooftop Air Handlers & 1 Cooling Tower, Department of Administration, Idaho Falls, Idaho | YMC NON-RESPONSIVE | |||
Sermon Services | $322,169 | 10-30-24 | ||||
B & S Boiler | $365,000 | |||||
10-17-24 | 21269 | Replace Lower Level Floor, Niccolls Bldg., University of Idaho, Moscow, Idaho | Springer Construction | $185,000 | 1. $17,000 2. $6,000 | |
Quality Construction | $219,869 | 1. $14,859 2. $15,647 | ||||
Mangum Construction | $147,500 | 1. $11,000 2. $8,000 | 11-06-24 | |||
K&G Construction | $193,301 | 1. $15,740 2. $7,833 | ||||
WM Welch Corp. NON-RESPONSIVE | ||||||
Legacy Construction | $194,026 | 1. $13,400 2. $7,780 | ||||
Ginno Construction | $171,000 | 1. $12,000 2. $7,300 | ||||
10-15-24 | 23255 | New Elevator/ Access Improvements, Hartung Theater, University of Idaho, Moscow, ID | Wright Brothers, The Building Company | $1,123,038.00 | 1. $7,500.00 | 10-29-24 |
Mangum Construction LLC | Non-Responsive | |||||
Quality Contractors, LLC | $1,440,895.44 | 1. $19,530.00 | ||||
Ginno Construction Co. | $1,384,000.00 | 1. $12,600.00 | ||||
09-26-24 | 20232 (RE-BID2) | Custodial Building, Idaho State University, Pocatello, Idaho | RS Jobber Inc. | $326,916 | 1. $24,662 | |
Rivers West Construction | $380,200 | 1. $27,750 | ||||
Alpine Construction Management (ACM) | $318,875 | 1. $15,973 | 10-09-24 | |||
Alan Clark Construction | $324,000 | 1. $19,600 | ||||
09-26-24 | 23154 | Replace Server Room AC Unit, Sam Glenn Complex, Lewis-Clark State College, Lewiston, Idaho | Mangum Construction | $335,000 | ||
K&G Construction | $331,400 | 10-07-24 | ||||
Kenaston Corporation | $429,030 | |||||
9-25-24 | 23193 | Active Learning Classroom Improvements, Multiple Bldgs, Ph 2 | Pentex Builders, LLC | $789,563 | $629,693 | |
Barrier Building, Inc | $581,000 | $530,000 | ||||
Wright Brothers, The Building Company | $660,473 | $450,500 | ||||
Andersen Construction Company of Idaho | $620,420 | $479,420 | ||||
Alpine Construction Management | $582,856 | $398,271 | 10-04-24 | |||
Pacific Source Construction | $608,000 | $440,000 | ||||
Stroth General, LLC | $1,100,000 | $590,000 | ||||
09-19-24 | 19107 | Entry Access Controls, Phase II, College of Southern Idaho, Twin Falls, ID | Starr Corp. | $349,485 | 1. $251,791 2. $222,617 3. $176,000 4. $559,442 | 10-11-24 |
09-19-24 | 24018 | HVAC Upgrades Chinden Bldg. 6, Dept of Administration, Boise, ID | TVR Inc. | $209,700 | ||
Cascade Enterprises, Inc. | $298,000 | |||||
YMC Inc. | $177,405 | 10-09-24 | ||||
09-18-24 | 23301 | TF Office Bldg., Department of Labor, Twin Falls, Idaho | Petersen Brothers | $4,400,900 | ||
Wright Brothers | $4,364,000 | |||||
Pacific West Construction | $4,354,259 | |||||
Gary Jones Construction | $4,664,300 | |||||
Andersen Construction | $4,678,420 | |||||
Construction Solutions Company | $4,409,935 | |||||
Alpine Construction Management | $4,236,494 | 09-25-24 | ||||
Stroth General | $7,989,000 | |||||
Faber Construction Corporation | $4,567,000 | |||||
09-12-24 | 24092 | Fine Arts Fire Alarm Replacement, College of Southern Idaho, Twin Falls, Idaho | System Tech | $366,910.69 | 9-25-24 | |
09-11-24 | 20201 | REBID Replace Siding, Yanke FRP, Boise State University, Boise, Idaho | Pacific Source Construction | $1,660,000 | 1. $265,000 2. $303,000 3. $113,000 | |
Alpine Construction Management, LLC | $1,707,315 | 1. $159,201 2. $195,890 3. $129,084 | ||||
Andersen Construction Company of Idaho, LLC | $1,252,420 | 1. $214,852 2. $242,967 3. $87,800 | 10-03-24 | |||
Stroth General, LLC | $1,787,997 | 1. $151,494 2. $191,947 3. $109,000 | ||||
Prusik Construction, LLC | $1,899,818 | 1. $136,378 2. $183,413 3. $98,443 | ||||
Petersen Brothers Construction NON-RESPONSIVE | ||||||
09-10-24 | 21068 | Plumbing Remodel, E&G Block, IMSI, Department of Correction, Kuna, Idaho | Alpine Construction Management | $885,671 | 9-12-24 | |
Lacy Mechanical, Inc. | $935,000 | |||||
08-22-24 | 23221 | Relocate eISU & ITRC, Idaho State University, Pocatello, Idaho | Construction Solutions Company, LLC | $789,282 | ||
EKC, Inc. | $692,672 | 9-13-24 | ||||
Pentex Builders, LLC | $761,440 | |||||
Petersen Brothers Construction, Inc. | $965,237 | |||||
Rivers West Construction, Inc. | $1,014,000 | |||||
Alpine Construction Management | $924,215 | |||||
08-21-24 | 24354 | Patient Treatment Facility, Expand Unit Fence, Health and Welfare, Blackfoot, Idaho ALL BIDS REJECTED | Haddon's Fencing, Inc. | |||
Independence Fence Company LLC | ||||||
Rivers West Construction, Inc. | ||||||
08-20-24 | 24357 | Repave Parking Lot & Replace Concrete, Health and Welfare, Blackfoot, Idaho | Idaho Materials and Construction | $284,044 | $37,945 | 9-4-24 |
Sunroc Construction Co., Inc. | $390,000 | $40,000 | ||||
RS Jobber, Inc. | $305,361 | $53,482 | ||||
Mickelsen Construction, Inc. | $314,465 | $29,511 | ||||
Gale Lim Construction, LLC. | $394,925 | $42,000 | ||||
BFC Diversified LLC | $498,604 | $22,360 | ||||
8-15-24 | 24570 | Dist 1 Admin Office Fire Alarm Upgrade, Transportation, Coeur d'Alene, Idaho | Advanced Electric & Alarm Systems, Inc. | $297,062 | 8-23-2024 | |
McKinstry Co., LLC | $397,203 | |||||
Ginno Construction | $479,000 | |||||
08-14-24 | 24462 | CYNC Restroom Remodel & ADA Upgrades, College of Western Idaho, Nampa, Idaho | Barrier Building, Inc | $578,876.00 | ||
Wright Brothers, The Building Company | $593,485.00 | |||||
EKC, Inc. | $566,239.00 | |||||
Stroth General | $655,343.00 | |||||
Scott Hedrick Const. Inc. | $554,000.00 | |||||
Andersen Construction Company of Idaho | $544,420.00 | 8-23-2024 | ||||
Pentex Builders | $626,600.00 | |||||
Excelsior Construction Company | $588,900.00 | |||||
Pacific Source Construction | $694,000.00 | |||||
08-01-24 | 24095 | Health Sci Parking & Lighting Expansion, College of Southern Idaho, Twin Falls, Idaho ALL BIDS REJECTED | Gary D. Jones Construction Co., Inc. | |||
Burks Excavation Corporation of Idaho | ||||||
Kloepfer Inc. | ||||||
Idaho Materials & Construction | ||||||
07-30-24 | 24222 | Performing Arts, Replace Concrete Steps, Idaho State University, Pocatello, Idaho | JM Concrete Inc. | $540,300.00 | 1. $20,000 | |
RS Jobber Inc. | $444,387.00 | 1. $10,033 | 8-30-24 | |||
Morco Construction | $722,358.00 | 1. $14,300 | ||||
07-09-24 | 21537 | Visitation Room, JCCS, Department of Juvenile Corrections, St. Anthony, Idaho | ACM (Alpine Construction Management) | $595,963.00 | ||
Rivers West Construction, Inc. | $663,370.00 | |||||
Construction Solutions Company, LLC. | $628,271.00 | |||||
Bateman-Hall, Inc. | $507,700.00 | 7-24-24 | ||||
06-26-24 | 22190 | Replace Roof Education Building, Boise State University, Boise, Idaho | Cano Roofing Inc. DBA Signature Roofing | $424,270 | 1. $24,210 | 07-03-24 |
06-20-24 | 21082 | New Office & Training Center, TVCR, Department of Correction, Idaho Falls, Idaho | Rivers West | $1,444,500 | 1. $15,800 2. $23,430 | |
Construction Solutions | $822,744 | 1. $13,890 2. $12,450 | ||||
Wind River | $842,434 | 1. $16,851 2. $20,625 | ||||
ACM (Alpine Construction Management) | $710,653 | 1. $15,147 2. $9,838 | 07-08-24 | |||
Pentex | $762,850 | 1. $15,000 2. $11,500 | ||||
Pacific West NON-RESPONSIVE | ||||||
06-20-24 | 23130 | Security Camera/Building Access System, College of Eastern Idaho, Idaho Falls, Idaho | Day Wireless | $426,863.45 | 1. $0 | |
System Technology | $359,970 | 1. $54,812 | 07-01-24 | |||
06-18-24 | 23622 | Admin. Offices, Idaho State Historical Society, 2205 Old Penitentiary Rd., Boise, Idaho | Wright Brothers | $181,540 | 1. $11,053 | |
Prusik Construction NON-RESPONSIVE | ||||||
Leverage General | $160,496 | 1. $14,598 | ||||
Beal Corp | $156,000 | 1. $15,500 | ||||
EKC, Inc. | $178,000 | 1. $0 | ||||
ACM (Alpine Construction Management) | $168,217 | 1. $15,940 | ||||
Triple G Construction | $117,635 | 1. $19,108 | 07-01-24 | |||
Barrier Building | $176,670 | 1. $10,716 | ||||
Scott Hedrick Construction | $190,738 | 1. $15,000 | ||||
Excelsior | $161,800 | 1. $10,300 | ||||
06-11-24 | 22621 | ADA Public Access, Old Pen Admin Building, Idaho State Historical Society, Boise, Idaho | Barrier Building, Inc. | $358,863 | ||
Andersen Construction Company of Idaho, LLC. | $286,420 | 06-24-24 | ||||
Sletten Construction Company | $474,500 | |||||
Wright Brothers, The Building Company, Eagle LLC | $300,953 | |||||
EKC, Inc. | $288,500 | |||||
ACM (Alpine Construction Management, LLC.) | $293,727 | |||||
Scott Hedrick Construction, Inc. | $310,900 | |||||
Beal Corporation | $325,000 | |||||
06-06-24 | 19380 | Replace Low Slope Roof, State Hospital North, Department of Health and Welfare, Orofino, Idaho | K & G Construction LLC. | $407,545 | 1. $299,545 Unit Price: 1. $20,000 | 07-09-24 |
06-04-24 | 19193 | Irrigation Central Pumping Station & Main Line, South Campus, Boise State University, Boise, Idaho | Knife River | $6,221,900 | ||
Idaho Site Works | $3,110,038 | 06-07-24 | ||||
Mountain Companies, LLC | $5,591,597 | |||||
Cascade Enterprises | $3,835,000 | |||||
05-30-24 | 23030 | Siding Replacement, Food Quality Assurance Lab, Department of Agriculture, Twin Falls, Idaho | CV Construction | $155,600 | ||
BMM Construction | $97,350 | 06-20-24 | ||||
JP2 Construction | $278,000 | |||||
05-28-24 | 24352 | Replace Fire Lane Asphalt, State Hospital North, Department of Health and Welfare, Orofino, Idaho | Motley-Motley, Inc. | $118,000 | Unit Price: 1. $8,500 2. $1,237.50 3. $416.50 | 06-11-24 |
Poe Asphalt Paving Inc. | $165,000 | Unit Price: 1. $14,500 2. $9,020 3. $8,540 | ||||
05-23-24 | 23256 | HVAC, Ph 2, Ag Science, University of Idaho, Moscow, Idaho | Wright Brothers, The Building Company, Eagle LLC | $11,320,000 | 1. $1,218,000 | 06-11-24 |
Ginno Construction of Idaho, Inc. | $12,150,000 | 1. $1,680,000 | ||||
Quality Contractors, LLC. | $12,918,000 | 1. $1,637,000 | ||||
05-21-24 | 24878 | Elevator Service, Maintenance, Alteration and Repairs Contract – Lewiston State Office Building | TK Elevator | $161,800 | 07-18-24 | |
05-21-24 | 24877 | Elevator Service Contract, Maintenance, Alteration and Repairs Contract – Idaho Falls State Office Building | TK Elevator | $88,550 | 07-18-24 | |
05-21-24 | 24875 | Elevator Service, Maintenance, Alteration and Repairs Contract – Capitol Mall | TK Elevator | $168,550 | 07-18-24 | |
05-15-24 | 23226 | Replace RTU Air Handlers, College of Technology, Idaho State University, Pocatello, Idaho | Rivers West Construction | $2,459,700 | 06-05-24 | |
05-09-24 | 23626 | 2nd Floor Remodel, LBJ, State Department of Education, Boise, Idaho | Andersen Construction | $210,850 | 05-17-24 | |
EKC, Inc. | $242,200 | |||||
Prusik Construction | $239,000 | |||||
Excelsior Construction | $274,900 | |||||
Beal Corp | $259,900 | |||||
Wright Brothers | $296,859 | |||||
05-09-24 | 21654 | Repair Utility Tunnel, Idaho State University, Pocatello, Idaho | Engineered Structures, Inc. | $5,293,294 | 05-17-24 | |
05-07-24 | 23254 | Road Access Improvements, Idaho Ave & Kibbie, University of Idaho, Moscow, Idaho | Quality Contractors | $1,005,050 | 1. $21,500 2. $22,400 | |
Germer Construction | $865,786 | 1. $21,000 2. $36,904 | 05-14-24 | |||
05-02-24 | 21072 | Paving/Repairs, Parking Lot, Perimeter Road, NICI, Idaho Department of Corrections, Cottonwood, Idaho | Crea Construction Inc | $3,425,000 | ||
Knife River Corp | $2,842,000 | 05-09-24 | ||||
LaRiviere Inc | $3,301,669 | |||||
04-30-24 | 23333 | Pocatello FMS 5 Wash Rack, Division of Military, Pocatello, Idaho ALL BIDS REJECTED | Alan Clark Construction LLC | $538,000 | ||
River West Construction Inc | $798,180 | |||||
04-24-24 | 20571 (Re-Bid) | District 6 Rigby Sewer Line, Idaho Transportation Department, Rigby, Idaho | HWW | $490,500.00 | 05-09-24 | |
Triple J | $799,229.50 | |||||
04-23-24 | 23131 | Replace Roof, Sessions Bldg., College of Eastern Idaho, Idaho Falls, Idaho | Signature Roofing | $734,000 | Unit Price: $3,500 | |
Smith Roofing & Siding | $631,700 | Unit Price: $1,100 | 05-10-24 | |||
Robison Roofing | $675,500 | Unit Price: $2,500 | ||||
Elite Roofing Systems | $761,750 | Unit Price: $3,500 | ||||
Contract West | $757,000 | Unit Price: $2,500 | ||||
Weathertight Roofing | $679,000 | Unit Price: $550 | ||||
04-17-24 | 24196 | Psych Sci (Bldg 071) Remodel, Boise State University, Boise, Idaho | KHI Construction | $391,703 | ||
Wright Brothers | $309,755 | |||||
Pentex Builders | $264,865 | |||||
Prusik Construction | $262,000 | |||||
ACM (Alpine Construction Management) | $308,552 | |||||
Andersen Construction NON-RESPONSIVE | ||||||
Barrier Building | $247,247 | |||||
Scott Hedrick Construction | $246,650 | |||||
JP2 Construction | $265,350 | |||||
Excelsior Construction | $205,500 | 04-30-24 | ||||
EKC, Inc. NON-RESPONSIVE | ||||||
04-16-24 | 24867 & 24868 | Floor Covering Service Contracts, Capitol Mall and State Facilities | Arrowstone Property Maint. | $81,535 | ||
Great Floors | $52,210 | |||||
Dillabaugh's Flooring America | $51,970 | 04-25-24 | ||||
Wall 2 Wall Flooring | $52,290 | |||||
Designer Floors | $51,909 | 04-25-24 | ||||
04-04-24 | 24097 | N. College Rd ADA Ped Sidewalk, College of Southern Idaho, Twin Falls, Idaho | Excelsior | $144,900 | 1. $22,850 2. $21,900 | 04-24-24 |
Western Design | $152,966 | 1. $10,500 2. $28,982 | ||||
Triple J Excavation | $162,000 | 1. $38,105 2. $13,000 | ||||
Petersen Brothers | $168,500 | 1. $30,000 2. $16,500 | ||||
Hayes Construction | $161,623 | 1. $22,660 2. $14,525 | ||||
KLoepfer | $196,750 | 1. $65,200 2. $18,250 | ||||
03-28-24 | 21662 | Remodel Counseling/Testing Ctr., Albion Hall, Idaho State University, Pocatello, Idaho | Alan Clark | $1,035,000 | 1. $48,900 2. $96,200 3. $60,000 | |
Big-D | $1,053,385 | 1. $40,277 2. $65,409 3. $55,317 | 04-25-24 | |||
CM Company | $1,049,000 | 1. $49,500 2. $97,000 3. $46,000 | ||||
ESI | $1,082,628 | 1. $43,524 2. $84,842 3. $48,968 | ||||
Ormond | $1,037,675 | 1. $45,900 2. $78,600 3. $54,500 | ||||
Rivers West | $1,112,000 | 1. $51,500 2. $100,800 3. $60,800 | ||||
Pentex | $1,028,100 | 1. $51,250 2. $79,600 3. $56,500 | ||||
03-26-24 | 24500 | SW Supervisory Area Office, Repave Parking Lots, Department of Lands, Boise, Idaho | Idaho Dirt Company LLC | $375,000 | 04-09-24 | |
Paul Construction NON-RESPONSIVE | ||||||
Bricon, Inc. | $419,000 | |||||
03-22-24 | 22252 | ADA Accessible Curb Ramps, Main Campus, University of Idaho, Moscow, Idaho | Germer Construction, Inc. | $256,304 | 1. $23,120 2. $26,840 | |
Quality Contractors, LLC | $237,800 | 1. $37,425 2. $26,565 | 04-11-24 | |||
03-19-24 | 24853-24855 | Roofing Service Contracts (Re-Bid), Southwest Region | Flynn Roofing NON-RESPONSIVE | |||
Upson Company | $225,790 | 04-05-24 | ||||
Weathertight Roofing | $174,410 | 04-05-24 | ||||
AAA Roofing | $195,125 | 04-05-24 | ||||
Summit Roofs | $263,980 | |||||
03-19-24 | 24856-24857 | Roofing Service Contracts (Re-Bid), Southeast Region | Power Mtn. | $492,775 | ||
Upson Company | $186,500 | |||||
AAA Roofing | $179,450 | 04-05-24 | ||||
Summit Roofs | $213,050 | |||||
Weathertight Roofing | $176,755 | 04-05-24 | ||||
03-19-24 | 24858 | Roofing Service Contracts (Re-Bid), North Region | Upson Company | $186,500 | ||
AAA Roofing | $179,450 | |||||
Summit Roofs | $213,050 | |||||
Weathertight Roofing | $158,255 | 04-05-24 | ||||
03-19-24 | 21364 (Re-Bid) | Upgrade HVAC, Whitehall, SWITC, Department of Health & Welfare, Nampa, Idaho | Hobson Fabricating Corp. | $138,000 | 1. $37,700 | |
YMC Mechanical | $89,027 | 1. $39,867 | ||||
TVR NON-RESPONSIVE | ||||||
Atlas Heating & Air | $77,781 | 1. $20,865 | ||||
03-14-24 | 22383 | Nurses Station Safety Upgrades, SHN, Department of Health & Welfare (DHW), Orofino, Idaho | Mangum Construction | $1,077,000 | 03-29-24 | |
K & G Construction | $1,260,450 | |||||
03-13-24 | 20620 | Replace Roofs, Pioneer Village, Idaho State Historical Society (ISHS), Boise, Idaho | Contract West | $178,000 | ||
Weathertight Roofing | $78,400 | 3-19-24 | ||||
Upson Company | $101,600 | |||||
Signature Roofing | $84,400 | |||||
03-07-24 | 23353 (Re-Bid) | Repair Parking Lot, Department of Health & Welfare, Lewiston, Idaho | K & G Construction | $145,302 | 1. $22,240 2. $3,640 | 03-14-24 |
McCall's Classic Construction | $162,300 | 1. $15,180 2. $3,360 | ||||
Carlton Builders | $179,620 | 1. $16,144 2. $2,360 | ||||
03-06-24 | 21622 Painting | Painting, Warden’s House, Old Pen, Idaho State Historical Society, Boise, Idaho | BMM Construction LLC | $24,350 | 03-25-24 | |
03-06-24 | 21622 Roof | Repair Roof Warden’s House, Old Pen, Idaho State Historical Society, Boise, Idaho | Signature Roofing | $124,000 | 03-25-24 | |
Upson Company | $116,000 | |||||
02-29-24 | 23602 | Reseal Parking Lot, VETS-L, Division of Veterans Services, Lewiston, Idaho | Stripes A Lot, LLC | $29,483.00 | 1. $49,300 2. $33,800 | |
Rocky Mountain Coatings Inc. | $14,955.00 | 1. $48,745 2. $29,500 | 03-13-24 | |||
02-13-24 | 21082 | New Office & Training Center, TVCRC, Department of Correction, Kuna, Idaho | Pentex Builders | $664,590 | 1. $20,442 2. $9,025 | |
Andersen Construction | $575,111 | 1. $12,596 2. $7,714 | ||||
NNAC Construction | $573,863 | 1. $18,533 2. $10,502 | ||||
Scott Hedrick | $531,000 | 1. $13,975 2. $8,208 | ||||
Petra | $698,700 | 1. $15,340 2. $8,407 | ||||
ACM (Alpine Construction Management) | $516,900 | 1. $16,762 2. $9,838 | 02-20-24 | |||
EKC | $571,650 | 1. $14,140 2. $9,200 | ||||
Prusik | $614,000 | 1. $16,000 2. $8,500 | ||||
Barrier Building | $560,000 | 1. $14,376 2. $8,444 | ||||
Wright Brothers | $565,788 | 1. $14,800 2. $8,600 | ||||
Excelsior Construction | $538,500 | 1. $14,000 2. $15,000 | ||||
Lacy Mechanical | $551,360 | 1. $14,055 2. $8,600 | ||||
02-12-24 | 21652 | Campus Roadway Maintenance, Boise State University, Boise, Idaho | Idaho Dirt Company | $299,000 | 02-26-24 | |
Paul Construction Inc. | $317,200 | |||||
02-07-24 | 22502 | St. Joe Area Field Office, ID Department of Lands, St. Maries, Idaho | Apollo, Inc. | $5,125,000 | 1. $18,200 2. $27,500 3. $22,800 Unit Price: 1. $2,000 2. $3,500 | |
Ginno Construction | $4,510,000 | 1. $15,700 2. $14,900 3. $28,000 Unit Price: 1. $2,200 2. $3,800 | 02-21-24 | |||
Bobo Construction | $4,895,466 | 1. $21,000 2. $28,000 3. $25,000 Unit Price: 1. $210,000 2. $360,000 | ||||
Stancraft Construction Group | $4,750,000 | 1. $15,600 2. $12,830 3. $31,330 Unit Price: 1. $1,500 2. $2,500 | ||||
02-06-24 | 21268 (Re-Bid) | Campus Drive Repairs, Ph 2, University of Idaho, Moscow, Idaho | LaRiviere, Inc. | $1,749,907.02 | 1. $71,442.18 2. $52,354.92 3. $56,498.92 4. $20,536.52 | |
Mangum Construction, LLC | $1,587,910 | 1. $79,575 2. $32,570 3. $34,436 4. $69,419 | ||||
Germer Construction, Inc. | $1,126,003 | 1. $69,267 2. $18,448 3. $20,606 4. $51,672 | 02-16-24 | |||
02-01-24 | 23354 | LED Lighting, Admin Hallway, Maintenance Warehouse, State Hospital South, Department of Health and Welfare, Blackfoot, Idaho | Arco Electric | $300,400 | 1. $29,100 2. $139,100 3. $41,700 | |
Mountain West Electric | $268,000 | 1. $18,500 2. $72,000 3. $8,000 | ||||
Rocky Mountain Electric | $258,464 | 1. $15,730 2. $69,860 3. $6,970 | 02-13-24 | |||
01-04-24 | 23016 | Replace Data Chiller, Capitol, Department of Administration, Boise, Idaho | ACCO Engineered Systems | $419,761 | ||
Cascade Enterprises | $389,000 | 01-16-24 |